How to install kitchen cabinet
How to install kitchen
cabinet
The
general principle is wall hanging cabinets’ installation after base cabinet,
and the hardware is the key-point.
Step
1, installation of base cabinet , you should clean the kitchen floor before
installation, in order to accurately measure the ground level. If the kitchen cabinet
cannot be the same level with the ground, cupboard doors may leave a lot of gaps
which leads to unbalance of its doors, by means of using the level ruler to
measure and understand the ground level ,finally adjust horizontal of the
kitchen cabinet, if base cabinet is L or U shape, then you need to find out the
base point on both sides of the ground from the right Angle to the side
extension; the middle straight base kitchen cabinet of U-shaped kitchen should
be first put horizontally, and then
install other two cabinets from its both angles , in case of the occurrence
crack of the base cabinet after installing finished, adjusting and correct the leveling by change
the position of legs .
Step
2,after the installation of base kitchen cabinet, you can start to install the
wall hanging cabinet , to ensure that the level of the expansion bolts are in a
line, you need to draw a horizontal line on wall, normally the distance between
horizontal line and the countertop is 650 mm, you can also decide this distance
as your demand, to ensure that connect closely of your hanging cabinet and wall
you should use the same connector, it is necessary to adjust the height of your
hanging cabinet in a suitable site ,because
it will directly affect the aesthetic of your whole kitchen.
Step
3, installation of countertop, At present the consumers of kitchen cabinets on
the market are often requiring to use man-made stone or natural stone as countertops.
Stone material countertop consists of a few stone adhesive, the appearance and
the quality of this stone countertop are greatly influenced by its bonding time
and glue quantity and level. Usually, its bonding needs half an hour in summer,
but 11.5 hours for winter. To use
professional glue adhesive for bonding, and using grinding machine for grinding
and polishing In addition, some ambry manufacturer to error due to decorate,
the ground ark and condole ark installation after the completion of a period of
time to install countertops, there will be a quantity of mesa process in the
middle.
Step
4, installation of hardware, birdbath
,faucet and pull basket is the key device of a kitchen, in order to prevent the
dust felling into the slide channel of pull basket, you should first put a
cover on the pull basket, birdbath device is engaged in the problem of draining
, so you should use the professional drilling device to punch according to the
size of the draining pipe, the diameter of the holes should be larger than the
pipe at least 3 to 4 mm, and hermetic seal is used immediately after drilling
hole to avoid edge expansion deformation which can affect the service life of
the cabinet, In order to prevent water or water seeping in, hose connection
with birdbath should use sealing strip or glass glue sealing, hose and sewage
also want to use glass glue to seal
Step
5, installation of kitchen electric appliance, it is most important to set plug
holes for the embedded electronics devices, but the holes of power can't open
too small, so as to avoid difficulty of its uninstalling when comes to maintenance,
to guarantee the exhausting of smoke, you must set a lampblack machine above
the stove in a hearth distance between 750 and 800 mm, device around the
kitchen and smoke lampblack machine to align with each other, and height can be
adjusted according to actual condition device kitchen is the most important
connection gas source, to ensure that songs in the mouth does not leak, air
supply should be sent by the gas company commonly connection, if it is a
decoration workers device, also need to let the gas company to detect gas
leakage
Step
6, installation of its doors, adjustment of the door is in order to ensure the
cupboard door united and ensure horizontal flat as well as vertical degree, the
distance between base kitchen doors’ surface and the wall is about 550 mm, and
300 millimeter for hanging cabinet, at last, you should also do some kitchen
clean after the installation of whole set of kitchen cabinet.